Future-automation QA2 Uživatelský manuál Strana 8

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 24
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 7
Installation: Stage 3
Page 7 of 22 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
QA2 & QA2-60 - Quad Arm
Fitting the Mechanism to the Wall
Once you have decided on the location of your screen you can fix the wall plate to the wall.
-Fix through one of the top holes first.
-Using the wall plate as a template, mark the other holes before drilling into the wall.
-Make sure a spirit level is used at all times to ensure mechanism is always level.
-Make sure the wall which the mechanism is being mounted to is structurally suitable.
-Minimum 2 person install step.
It is the installers responsibility to
choose the appropriate fixings when
attaching to the wall and to make sure
the mechanism is secure and safe.

Zobrazit stránku 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Komentáře k této Příručce

Žádné komentáře