Installation: Stage 2
Page 6 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PH2 - Projector Hinge
- ON BOARD ELECTRONICS!
- Control box wiring, refer to page 12 Electrical Connections
- Connect the control box to the mains power supply
- Connect the infrared remote sensor even if you are going to
use switch control
- Cables can be easily extended
Creating the void in the wall
- Hole size for mechanism: PH2 - Width 800mm
Height 710mm
Depth 300mm
- Clear space free from joists and other objects
- Secure timber joists in place to support the unit left, right top and bottom
- ORGANISE CABLES READY TO THREAD THROUGH THE MECHANISM
Control box setup
800
[31.5]
710
[28]
300 [11.8]
+ Panel
Thickness
Front Panel
Back Joist
Frame Work